SC 09FILM BUDGET TEMPLATEFree · no account

Film budget
template.

Above the line, below the line, post and contingency — already laid out, with the sections most budgets forget.

Fill it in on this page, or download the Excel file and work there. The download carries live formulas, so it keeps calculating after it leaves us. No account, no email address, nothing uploaded.

These head the spreadsheet you download. Everything stays in this tab.

Above the line

What the film costs to commission: the people attached before a crew exists.

€0.00

Above-the-line

Producer, director, writer, executive producer — fees agreed before the crew exists.

€0.00
DescriptionQtyUnitRateDays / unitsTotal
Qty
Rate
Days / units
€0.00
Qty
Rate
Days / units
€0.00
Qty
Rate
Days / units
€0.00

Cast

Principal cast, supporting, extras. Include buyout terms in the description.

€0.00
DescriptionQtyUnitRateDays / unitsTotal
Qty
Rate
Days / units
€0.00
Qty
Rate
Days / units
€0.00
Qty
Rate
Days / units
€0.00

Below the line

What it costs to actually shoot: crew, kit, and everything that gets them there and fed.

€0.00

Crew

People × rate × days, per role. Include prep and wrap, not just the shoot.

€0.00
DescriptionQtyUnitRateDays / unitsTotal
Qty
Rate
Days / units
€0.00
Qty
Rate
Days / units
€0.00
Qty
Rate
Days / units
€0.00
Qty
Rate
Days / units
€0.00

Equipment

Camera, lenses, lighting, grip, sound. Owned kit at what it would cost to rent.

€0.00
DescriptionQtyUnitRateDays / unitsTotal
Qty
Rate
Days / units
€0.00
Qty
Rate
Days / units
€0.00
Qty
Rate
Days / units
€0.00
Qty
Rate
Days / units
€0.00

Locations

Fees, hire, scouting, standby power, permits and road closures.

€0.00
DescriptionQtyUnitRateDays / unitsTotal
Qty
Rate
Days / units
€0.00
Qty
Rate
Days / units
€0.00

Transport

Vans, fuel, tolls, flights, parking.

€0.00
DescriptionQtyUnitRateDays / unitsTotal
Qty
Rate
Days / units
€0.00
Qty
Rate
Days / units
€0.00

Accommodation

Rooms × nights for crew away from base.

€0.00
DescriptionQtyUnitRateDays / unitsTotal
Qty
Rate
Days / units
€0.00

Catering

Per head, per day. Cheap to budget, expensive to improvise.

€0.00
DescriptionQtyUnitRateDays / unitsTotal
Qty
Rate
Days / units
€0.00

Insurance

Production, equipment and public liability.

€0.00
DescriptionQtyUnitRateDays / unitsTotal
Qty
Rate
Days / units
€0.00

Post and licensing

Everything after the wrap — and the rights you have to clear.

€0.00

Post-production

Edit, grade, sound mix, VFX, deliverables.

€0.00
DescriptionQtyUnitRateDays / unitsTotal
Qty
Rate
Days / units
€0.00
Qty
Rate
Days / units
€0.00
Qty
Rate
Days / units
€0.00

Music and licensing

Composer, library tracks, archive footage, stills.

€0.00
DescriptionQtyUnitRateDays / unitsTotal
Qty
Rate
Days / units
€0.00

Other

Whatever the sections above don't cover.

€0.00

Other expenses

Anything the sections above don't cover.

€0.00

SC 10WHAT THE TEMPLATE COVERS

The structure is the part that saves you.

Nobody forgets to budget the camera. What gets forgotten is insurance, the permit, the second grade pass, and the fact that your own time as producer is a cost. A template is mostly a list of things you would not have thought of.

Above the line

Producer, director, writer, and cast. Fixed early, negotiated individually, and the part that doesn't move when the schedule does. If you're directing your own job, your time still belongs here — a budget that prices your labour at zero is telling you the job is profitable when it isn't.

Below the line

Crew, equipment, locations, transport, accommodation, catering, insurance. Everything that scales with the shoot: add a day and most of this section grows with it, which is why an extra day is never just the crew's rate.

Post and licensing

Edit, grade, sound mix, deliverables, and the music or archive you have to clear. The most commonly under-budgeted part of a first pass, because it happens weeks after everyone has stopped thinking about the shoot.

Contingency

A percentage on top of everything above, for the overrun you can't itemise yet. Ten per cent is the usual starting point. It is not a slush fund and it is not profit — it is the difference between a small surprise and a phone call to the client.


SC 11HOW TO USE IT

Quantity × rate × days, then a price you chose on purpose.

Every line multiplies out the same way, so any figure can be defended and any change can be re-checked. The bottom of the sheet turns the cost into a price.

  1. Fill each line in as quantity × rate × days or units — two grips, €250 a day, three days.
  2. Let the sections subtotal themselves, and read the group totals.
  3. Add contingency as a percentage of the subtotal. That figure is your production cost.
  4. Set a target profit margin, and the template works out the client price: price = cost ÷ (1 − margin).
  5. Download it. The .xlsx keeps every formula, so editing a rate in Excel moves the price at the bottom.

A margin is not a markup

Adding 33% to a €10,000 cost gives €13,300 — and a margin of 24.8%, not 33%. To actually keep a third of the invoice you charge €14,925. The film budget calculator sets that out in full; this template uses the margin formula.

Budget your own kit

Equipment you own isn't free: it depreciates, it needs servicing and insuring, and while it's on this job it can't earn anywhere else. Put it in at the rate you would have paid to rent it, so the job carries its real cost.

Then send it as a quote

A budget is for you; a quote is for the client, and it should not show them your internal rates. The quote generator turns the same numbers into a PDF with payment terms and exclusions.


SC 12WHERE A SPREADSHEET STOPS

This template is a good budget. It is not a good system for fifteen of them.

A spreadsheet doesn't know your gaffer moved onto night rate after 18:00. It doesn't notice when the kit list creeps between the quote and the shoot. It can't tell you that the 30% margin you quoted in March is tracking at 6% in June, or which client is quietly your least profitable. And a copy of it per job means a rate card that is right in one file and a year out of date in the others. That is the point where a template stops being the answer — and it's the whole reason Slatewise exists.

Keep the structure. Lose the fifteen copies of it.

Build my first budget

SC 13QUESTIONS

What is a film budget template?

A pre-structured breakdown of everything a production spends, organised the way the industry reads it: above-the-line, below-the-line, post-production and contingency. The structure is the useful part — it stops you forgetting the sections you don't think about until the invoice arrives, like insurance, permits or the post days that land three weeks after the shoot.

What is the difference between above-the-line and below-the-line?

Above-the-line is what the film costs to commission: producer, director, writer and principal cast — the people attached before there is a crew. Below-the-line is what it costs to actually make: crew, equipment, locations, transport, accommodation, catering and insurance. The split exists because ATL is mostly negotiated and fixed early, while BTL moves with the schedule — if the shoot grows by a day, everything below the line grows with it.

How do you structure a film budget?

One line per thing you pay for, with quantity, rate and the number of days or units, so every figure can be defended and re-checked when something changes. Group the lines into sections, subtotal each section, then add a contingency on the whole. A budget that is one number per department cannot be argued with line by line — which sounds convenient until a client asks you to cut 10%.

How much contingency should a film budget include?

Ten per cent of the pre-contingency subtotal is the usual starting point, and the default here. Documentaries, location shoots and anything abroad often carry more; a one-day studio job with a fixed crew can carry less. It covers the overrun you can't itemise yet — not the sections you forgot.

Does the downloaded template still calculate?

Yes. It downloads as a real .xlsx with live formulas, not a flat export: line totals, section subtotals, the contingency and the client price all recalculate as you edit it in Excel, Numbers or Google Sheets. Change a day rate and the price at the bottom moves.

Do I need an account to download the template?

No — no account, no email address, nothing uploaded. The spreadsheet is built in your browser on your own machine. Slatewise itself, where a budget becomes a schedule and margin reporting across projects, has a free plan with no card required.

SC END · TAKE 1 — KEEPER

Set up before the next job lands.

Free forever · No credit card · Start in 4 minutes. Cancel by deleting your account.

Prep my next production